Tailings Tailings Stabilizer
Tailings stabilizer is specifically designed for solidification and stabilization of mine tailings, enabling safe disposal and backfill operations.
Phone/WhatsApp:
Email:
Classification:
keyword:
Keda New Materials
Concrete Admixtures
Product Details
Technical Specifications
| Parameter | Value |
| Type | Tailings stabilizer |
| Form | Powder |
| Solidification time | 24-72 hours |
| Strength (7d) | ≥1 MPa |
| Dosage | 5-15% of tailings weight |
Key Features
• Rapid solidification of tailings
• Prevents heavy metal leaching
• Enables safe backfill
• Reduces environmental impact
• Cost-effective solution
Applications
• Mine tailings disposal
• Underground mine backfill
• Tailings dam stabilization
• Environmental remediation
Usage & Precautions
• Mix with tailings at specified ratio
• Add water to achieve required consistency
• Place in designated area
• Allow curing before loading
Packaging & Storage
• Powder: 25kg or 50kg bags or ton bags. Keep dry. Shelf life: 12 months.
Safety Information
• Avoid contact with eyes and skin.
• First Aid: A) Skin contact - rinse with clean water. B) Eye/mucosa contact - flush immediately with water and seek medical attention. C) When handling powder, wear dust mask and goggles. D) If swallowed - drink plenty of water, induce vomiting, and seek medical help.
Solution
Related Product
HOW CAN WE ASSIST YOU?
If you are interested in our products, please leave your contact information
Hotline:
WhatsApp+86 19195759867
Add:
No.9, Liangling Second Street,Nanning Area, China (Guangxi) Pilot Free Trade Zone