Application

| Comprehensive Concrete Solutions for diverse applications

APPLICATION

11/14

2025

Pinglu Canal

The Pinglu Canal is the first major canal project since the founding of the People's Republic of China that connects rivers and the sea, as well as the first canal constructed in China in over a thousand years following the Beijing-Hangzhou Grand Canal. As a backbone project of the New Western Land-Sea Corridor, it originates from the Pingtang River estuary in the Xijin Reservoir area of Hengzhou City, Nanning, Guangxi Zhuang Autonomous Region. It passes through Luwu Town in Lingshan County, Qinzhou, and follows the Qin River into the Beibu Gulf. With a total length of 134.2 kilometers, it includes an approximately 6.5-kilometer excavation section across the watershed ridge. Designed according to the Inland River Class I waterway standards, it can accommodate ships of up to 5,000 deadweight tons. The total investment amounts to 72.7 billion yuan. Construction on the project began in August 2022 and is planned to be largely completed by the end of 2026. As of September 10, 2024, the cumulative investment completed reached 59.25 billion yuan, with comprehensive construction of the main structures of the three major hubs now in full swing.

11/14

2025

Water resources in the northern region

The Guangdong Water Resources Allocation Project for the Beibu Gulf Rim is a key national water network project and one of China's 150 major water conservancy initiatives. It aims to address water scarcity in western Guangdong. The project draws water from the Yunfu section of the main stream of the Xijiang River, and through a main water conveyance line and three branch lines—Zhanjiang, Maoming-Yangjiang, and Yunfu—delivers water to four cities in western Guangdong. It is designed with a water diversion capacity of 110 cubic meters per second, an annual water supply volume of 2.079 billion cubic meters, and will benefit a population of approximately 18 million.

12/17

2025

Jinjitan Hydropower Station

Jinjitan Hydropower Station (also known as Long'an Jinjitan Water Control Project) is located on the upper reaches of the Youjiang River within Long'an County, Nanning City, Guangxi Zhuang Autonomous Region. It is situated approximately 8 kilometers from Long'an County town and about 96 kilometers from downtown Nanning.This project is the sixth cascade development on the main stem of the Yujiang River. It is designed primarily for power generation and navigation, while also providing comprehensive benefits including flood control, water supply, irrigation, aquaculture, and tourism.

12/17

2025

Guiping Water Control Project

The Datengxia Water Control Project is a national-level hydro-junction located on the Qianjiang River section in Guiping City, Guangxi. As a key regulatory project in the Pearl River Basin and one of China's 172 Major Water Conservation and Supply Projects, it plays a central role in flood control, navigation, power generation, water resource allocation, and ecological management.

12/17

2025

Chishui Port Terminal

Chishui Port Terminal is located at Chishui Market, Tangbu Town, Tengxian County, on the south bank of the Xun River in Wuzhou City, Guangxi. It is a key port operational area within the Xijiang Economic Belt Corridor, strategically positioned as the gateway between Guangdong and Guangxi. The terminal boasts excellent navigational conditions, capable of accommodating 3,000-ton-class vessels.It is the only large-scale comprehensive inland river terminal in the Xijiang River Basin integrating rail, road, waterway, and air transport. Additionally, it is a National Class I Open Port, equipped to handle both domestic and international trade operations.

12/17

2025

Xiaofeng Reservoir, Fangchenggang

Xiaofeng Reservoir is located in Fulong Town, Fangcheng District, Fangchenggang City, Guangxi. It is a Type II large reservoir serving comprehensive functions, primarily for flood control, irrigation, and water supply, with additional benefits such as power generation.Key Characteristics:Catchment Area: 54.5 square kilometers、Total Storage Capacity: 103 million cubic meters、Effective (Usable) Storage Capacity: 78.2 million cubic meters、Dead Storage Capacity: 3.5 million cubic meters

< 12 >

HOW CAN WE ASSIST YOU?

If you are interested in our products, please leave your contact information


Keda New Materials Group

Hotline:

Add:

No.9, Liangling Second Street,Nanning Area, China (Guangxi) Pilot Free Trade Zone


Copyrights©2025Guangxi Keda New Materials Group Co.,Ltd   Power:www.300.cn

%E7%AC%AC%E4%B8%80%EF%BC%8C%E6%9C%80%EF%BC%8C%E4%BC%98%E7%A7%80%EF%BC%8C%E5%A2%9E%E5%BC%BA%EF%BC%8C%E4%B8%80%E6%B5%81%EF%BC%8C%E5%8D%93%E8%B6%8A%EF%BC%8C%E9%A2%86%E5%85%88%EF%BC%8C%E5%85%88%E8%BF%9B%EF%BC%8C%E5%BC%95%E9%A2%86

Sorry,当前栏目暂无内容!

您可以查看其他栏目或返回 首页

Sorry,The current column has no content!

You can view other columns or return Home